Monday 20 February 2012

Build day 49


Build time today 1.0 hours - Total build time 129.0 hours.
Man time today 1.0 hours - Total man time 147.0 hours.

Only spent a little time today,  I had ordered an 8mm straight pipe coupler which I wanted to use to connect the existing crank case breather pipe to the new 8mm pipe I was using to connect to the oil catch can. I was using the existing pipe as this reduced from 13mm to 8mm. Using this and some cable wrap I finished assembling the oil catch can ready for installation.
I also fitted the number plate light to the rear body work section, meaning that all the wiring in this area were complete and the section was ready to mount.   