Build time today 2.0 hours - Total build time 108.5 hours.
Man time today 2.0 hours - Total man time 125.5 hours.
More time spent on the wiring, firstly yo finish off by sorting out the remaining earth wires, these needed to be cut to length and ring terminals attached before being taped, cable wrapped and secured to the rivet nut inserted in readiness.
Once this was done I then made some final adjustments to get the cables lined up before using cable ties and the rivet attached mount points to secure in place. Getting at them, especially those in the transmission tunnel was not easy but they are now secured in place, I hope to he requisite standard required for IVA.
Wires secured and covered, they just need the cable ties trimmed |
A view of the wires from the transmission tunnel, Very much neater than when I first started the tidy up opperation |
I have still got to secure the engine management box etc and wires further forward in the engine bay but these tasks are for another day. I won't fasten up the remaining engine bay wiring until I need to so that it can be adjusted to suit when I do the front lights etc.
No comments:
Post a Comment