Monday 28 November 2011

Build Day 3


Build time today 2 hours - Total build time 10.5 hours.
Man time today 3 hours - Total man time 17 hours.



Completed fitting the footwell panels and floor this evening, I am going to leave the side panels of for the time being to allow easier access. The holes are drilled ready so should not be a long task to complete those.

Footwell panels fitted and bottom panels ready to rivet
The car is now the correct way up, lets hope it stays that way (especially when driving).

Panels fitted and car now the right way up
 Decided to get on with the pedels next, sorted them all out together with the relavent nuts, bolts washers etc.
First mechanical bit, clutch pedal fitted.

Complete my first mechanical bit fitting the clutch pedal and cable.