Build time today 0.5 hours - Total build time 178.5 hours.
Man time today 0.5 hours - Total man time 204.0 hours.
Almost ready to start, I have all the parts required so managed to fill the coolant system and add a little petrol. First filled with two litres of anti freeze, topping up the header tank and letting it drain through then filling with water. I regularly checked the the pipes to see if I could see any leaks. It was only once it was full I could see what looked like a small leak from the lower radiator connection. Tightened it a little and it seemed to do the trick.
Checked again later and could still see a little moister and realized it was coming from the radiator temp sensor so carefully tightened it a little. Seemed to do the trick.
No comments:
Post a Comment