Build time today 2.0 hours - Total build time 31.5 hours.
Man time today 2.0 hours - Total man time 42.5 hours.
Had a couple of evenings off the build went to see Motley Crew and Def Leppard last night at the LG Arena with Becki and Oli.
|
Handy tool
Reamer |
Managed to pop into Westfield for them to have a look at the wishbone with the stuck rose joint. they could not budge it either so have left it with them soaking in WD40. As for the bar that would not go through the lower wish bone bush, they said the hole needs to be expanded a little I needed to either file it out or use a reamer, when I said I did not have one they leant me one, I will pop it back tomorrow. Did the job, and the bars now go through the bushes no problem.
|
Left hand bar inserted |
|
Right hand bar inserted |
Once that was sorted I started on the fuel lines, having done the brake pipes this was not as taxing as it could have been. Like with the brake pipes where they travel under the aluminium floor I managed to rivet from the inside keeping the inner floor as smooth as possible.
|
Fuel lines passing to the left of the
Brake master cylinder |
|
Fuel lines going down the centre tunnel |
Next, while the car is on its side I will drill the holes to mount the wiring loom as there as there are a number of holes that need to be drilled from below.
No comments:
Post a Comment